Using a Tally Jet Pump for frac load extraction decreases operator’s time to true production, results in 32000 bbls in 14 days.
Jet Pump System Ideal for Remote Site
Tally Jet Pump greatly increases oil and gas production from a Wilcox formation well, using less energy and eliminating the need for costly make up gas.
Artificial Lift Solution Increases Production
Tally Jet Pump replaces ESP in Woodbine formation well and substantially reduces workover cost while continually chemically treating wellbore.
Non-Productive Well Restored
Tally Slimhole Jet Pump saves a Permian Basin well from P&A and creates profit for the operator, with 105 bpd.
Operator Saves $133,000 in First Year
Tally Jet Pump installation reduces annual workover cost of a deviated beam pumping Frio well while increasing oil production and profitability.